Minggu, 29 September 2019
WORK VISIT BALIKPAPAN DAY 5th
Posted on September 29, 2019 by tohar bpz
WORK VISIT BALIKPAPAN DAY 4th
Posted on September 29, 2019 by tohar bpz
1. Drilling
brake linning 2pcs (rivets holes) at local workshop ( 2 pcs are finished)
2. Dissamble
& assemble 1 booster wheel at local workshop ( 1 boosterwheel finished )
3. Assemble
brake linning to brakeshoes ( using counter shunk rivets )
![]() |
| Assemble brake linning to brakeshoes ( using counter shunk rivets ) |
WORK VISIT BALIKPAPAN DAY 3rd
Posted on September 29, 2019 by tohar bpz
1. FInd local vendors to repair brake linning (counter shunk holes / rivets)
2. FInd alternative vendors for booster wheel repairs (dissamble & re-assemble)
![]() |
| repair brake linning (counter shunk holes / rivets) |
WORK VISIT BALIKPAPAN DAY 1st
Posted on September 29, 2019 by tohar bpz
1. disassemble the
booster wheel
Constraints: tools brought from Jakarta are not strong enough, the plate is bent
Solution :
- removed the plate,
- drilling holes on the booster wheel (covered with rubber when rubber lining)
2. find a local workshop for a hydraulic press to dissaemble & assemble booster wheels
3. boosterwheel has welds (welded by previous vendors) must be grinded first so that it can be opened with a hydraulic press
![]() |
| disassemble the booster wheel, Constraints: tools brought from Jakarta are not strong enough, the plate is bent |
maintenance mingguan bumper car
Posted on September 29, 2019 by tohar bpz
-pembersihan brush
-pembersihan plat kontaktor
-pembersihan pada bagian
Motor
Teknisi:hijri,Cikal
Trimakasih
-pembersihan plat kontaktor
-pembersihan pada bagian
Motor
Teknisi:hijri,Cikal
Trimakasih
![]() |
pembersihan pada bagian
Motor
|
Maintenance mingguan Sky Rider
Posted on September 29, 2019 by tohar bpz
Langganan:
Postingan (Atom)






